Project Detail

St. Brigid School of Kildare - Gymnasium

Dublin, Ohio

Following the construction of the Pastoral Center and the remodel of Enke Hall, O’Brien Robinson was asked to provide services to construct the new 13,710 sq/ft Gymnasium Project. The scope of the project includes the demo of the existing gymnasium and constructing the new gym.

Materials for Gymnasium addition/expansion include pre-engineered metal building, with stucco exterior panels. Standing seam metal roof, extensive HVAC and mechanical systems, hardwood gymnasium floor, stage, bleachers, storage, locker rooms and other ancillary spaces for usage.

All members of the O’Brien Robinson Team are working closely with the Building Committee and the Church to keep communications strong during pre-construction and will begin construction in June of 2008. O’Brien Robinson is involved in the Pre-Construction Phase to ensure that the final cost stay at $2.0m.

  • Acerage
    • 13,710 sq/ft
  • Completion Date
    • January 2009
  • Total Value of Construction
    • $2,000,000

Information

  • Owner
    • Catholic Diocese of Columbus
  • Architect
    • Sullivan Bruck Architects